Soft foundation treatment project of the third runway of Thailand Suvarnabhumi Airport

Client: Airports of Thailand PLC.
Contract Sum: 2,790M THB
Construction Period: Under Construction
Main Works: Soft foundation treatment project of the third runway of Thailand Suvarnabhumi Airport

Project of Rama III – Dao Khanong – Western Bangkok Outer Ring Road Expressway: Contract 2

Client: Expressway Authority of Thailand
Contract Sum: 6,870M THB
Construction Period: Under Construction
Main Works: This Project consist of an elevated expressway with total length of 5.32km which is 6 lanes in two-way, toll gate and other utilities works.

Project of MRT Green Line Mo Chit – Saphan Mai – Khu Kot Section Contract 2:Saphan Mai – Kukot Section, Civil Works

Client: Mass Rapid Transit Authority of Thailand
Contract Sum: 7,164M THB
Construction Period: Apr, 2015 – Dec, 2017

Main Works: This Project consist of the elevated runway along with Saphan Mai – Khu Kot Section, a distance of approximately 6.5 kilometers, consists of civil works, structural works, architecture, a system of the station work, and other works.

Terminal D1, D2 and D3 Laem Chabang Port, Phase 1 – Civil Works

Client: Hutchison Laemchabang Terminal Ltd.
Contract Sum: 6,048M THB
Construction Period: Sep, 2016 – Jan, 2021
Main Works: This Project consist of 1,000m and 700.4m high-pile terminal, a 285,000 sq.m container yard and other utility works.

Public Private-Partnership for the Laem Chabang Port Phase 3, Terminal F Project

Client: Port Authority of Thailand
Investment Sum: 33,194M THB
Construction Period: Nov, 2021 — Nov, 2051

Main Works: This Project consist of construction a breakwater with total length of 3,000m, dredging channel and basin with 57 million cu.m, construction and operation terminal F for 30 years.

Project of Construction and Completion the Track Doubling Chacheongsao – Khlong Sibkhao – Kaeng Khoi Section: Contract 1

Client: State Railway of Thailand
Contract Sum: 1,850M THB
Construction Period: Apr, 2016 — Sep, 2019
Main Works: This Project consist of total length about 24km. To complete pavement works, lay track ballast, track beds and tracks. To build 7 small and medium size railway bridges, and to complete drainage, power supply and other public facilities works.

Workshop for Refining Rubber #2 Project

Project owner: zhongce rubber (thailand) company limited
Total contract: 345 million baht
Construction period : Sep 2016 – Jun 2017
Main scope of work : Construction of a new factory for rubber bleaching This project has an area of ​​approximately 22,000 square meters, approximately 24.4 meters high.

Nong Pladuk Junction-Namtuk Junction Track Rehabilitation Project

Client: State Railway of Thailand
Contract Sum: 1,294M THB
Construction Period: Nov, 2013 — May, 2016
Main Works: Refurbishment of the dangerous railway with a length of approximately 125km and replacement with new track rail, turnout, pre-stressed concrete sleepers, ballast. Other rehabilitation works of renovating pavement and pathway, bridge for the railway, especially the rehabilitation of the railway bridge on the River Khwae.

Project of Southern Bangkok Outer-ring Expressway

Client: Ch. Karnchang Plc.
Contract Sum: 3,056M THB
Construction Period: Aug, 2004 — Dec, 2010
Main Works: This Project consist of construction of six lanes in two-way elevated expressway from KM 58+508.881 to KM 67+157.309 in total of 8.649km.

Samutprakarn Wastewater Management Project

Client: Pollution Control Department of Thailand
Contract Sum: 553M THB
Construction Period: Feb, 1999 – Aug, 2003
Main Works: Construction of a new outfall pipe with a length of approximately 3.4km that can treat up to 525,000 cubic meters of wastewater per day.